HCC concluded the drainage network improvement and joints injection works of Margalef dam

HCC concluded the drainage network improvement and joints injection works of Margalef dam

The works have included the injection with epoxy resin of one of its vertical joint, which means the 6th vault dam whose vertical joints have been injected by HCC around the World

 

Previous Next